Corner Cast designed and manufactured a leach building facility intended to create a more environmentally friendly copper extraction process.
Features
4X40' HC modified containers
Fully furnished, insulated and air conditioned office
Includes compressor and electrical room
Industrial mixers and big bag unloading structure
Translucent canopy allowing 80% of natural sunlight to reach the roof membrane
This structure was prefabricated in Montreal and shipped to Arizona. The building was erected in 2 weeks, reducing on site presence, equipment and man power circulation.
Back view of facility showing the copper leaching station